Uploaded image for project: 'Confluence Cloud'
  1. Confluence Cloud
  2. CONFCLOUD-76574

Tasks with same duplicated text status doesn't get updated properly in Tasks macro report

XMLWordPrintable

      Issue Summary

      Tasks with the same duplicated text status don't get updated properly in the Tasks macro report.

      This is reproducible on Data Center: no

      Steps to Reproduce

      1. Step 1

      On the main page create two tasks macro reports for incomplete tasks(Task status complete) and complete tasks(Task status complete) within the same space.

      1. Step 2
        Create two tasks pages with tasks with the same text

      Page 1
      eg:
      (/)Task 2

      Page2:
      (/)Task 2

      Step 3:
      Unchecking both Task 2 tasks from the main page pushes only one Task 2 to incomplete tasks macro not both.

      Expected Results

      Both Task 2 macros are pushed into incomplete tasks macros.

      Actual Results

      Only one task 2 macro gets pushed into incomplete tasks.

      Workaround

      Try unchecking task 2 from the Tasks page 1 and 2 instead of the main page. As unchecking from tasks pages 1 and 2 updated the main page status correctly.

              dab1de8d7e97 Beth Gilomen (Inactive)
              65fbe50fb211 Charneet Sodhi (Inactive)
              Votes:
              1 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated: