Tasks with same duplicated text status doesn't get updated properly in Tasks macro report

XMLWordPrintable

    • 2
    • Severity 3 - Minor
    • 1

      Issue Summary

      Tasks with the same duplicated text status don't get updated properly in the Tasks macro report.

      This is reproducible on Data Center: no

      Steps to Reproduce

      1. Step 1

      On the main page create two tasks macro reports for incomplete tasks(Task status complete) and complete tasks(Task status complete) within the same space.

      1. Step 2
        Create two tasks pages with tasks with the same text

      Page 1
      eg:
      (/)Task 2

      Page2:
      (/)Task 2

      Step 3:
      Unchecking both Task 2 tasks from the main page pushes only one Task 2 to incomplete tasks macro not both.

      Expected Results

      Both Task 2 macros are pushed into incomplete tasks macros.

      Actual Results

      Only one task 2 macro gets pushed into incomplete tasks.

      Workaround

      Try unchecking task 2 from the Tasks page 1 and 2 instead of the main page. As unchecking from tasks pages 1 and 2 updated the main page status correctly.

            Assignee:
            Beth Gilomen (Inactive)
            Reporter:
            Charneet Sodhi (Inactive)
            Votes:
            1 Vote for this issue
            Watchers:
            4 Start watching this issue

              Created:
              Updated: