Bug
-
Resolution: Unresolved
-
Medium
-
3
-
Severity 3 - Minor
-
1
-
Issue Summary
Tasks with the same duplicated text status don't get updated properly in the Tasks macro report.
This is reproducible on Data Center: no
Steps to Reproduce
- Step 1
On the main page create two tasks macro reports for incomplete tasks(Task status complete) and complete tasks(Task status complete) within the same space.
- Step 2
Create two tasks pages with tasks with the same text
Page 1
eg:
(/)Task 2
Page2:
(/)Task 2
Step 3:
Unchecking both Task 2 tasks from the main page pushes only one Task 2 to incomplete tasks macro not both.
Expected Results
Both Task 2 macros are pushed into incomplete tasks macros.
Actual Results
Only one task 2 macro gets pushed into incomplete tasks.
Workaround
Try unchecking task 2 from the Tasks page 1 and 2 instead of the main page. As unchecking from tasks pages 1 and 2 updated the main page status correctly.