Asana tasks are being reported with different status on Confluence smart cards

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • 0

      Issue Summary

      Links to Asana tasks are being correctly converted to smartcards, however, the status of the task in Confluence does not reflect the same status in Asana. For example a To Do task is shown as Upcoming.

      Steps to Reproduce

      1. Create a task in Asana and copy its link (e.g. status = To Do)
      2. create a page in Confluence and paste this link > Publish the page

      Expected Results

      • Link to be converted to a smart card and displaying the correct status of the task in Asana

        Actual Results

      • The Task link is correctly converted to a smartcard, however, its status is not the same as the status in Asana, as can be seen in this next screenshot:

      Workaround

      Currently, there is no known workaround for this behavior. A workaround will be added here when available.

      A possible alternative, in this case, would be adding the Asana link a regular link by either typing /link or command+K, pasting the link to Asana, and populating the name field.

              Assignee:
              Unassigned
              Reporter:
              Helton A. (Inactive)
              Votes:
              1 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: