Need an interface for triggering a JIRA backup and restore

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Duplicate
    • Component/s: None
    • None

      When performing a workflow migration, JIRA says:

      Note: You are about to begin a process that will change every issue in project XYZ. This process can take a long time, and therefore it is advisable to perform this operation when the system is under low load. Please ensure that you have a backup of your data before proceeding. If the process fails or JIRA is shutdown before the process completes, you can attempt to associate the workflow scheme wfs2 with project B Project again. If the process fails again, please restore from backup to ensure that issues in the project remain in a consistent state.

      Although this warning won't apply to most Studio customers with small JIRA instances, we have a few larger instances, and to use JIRA safely here requires being able to perform backups. We should have an interface for (at least) triggering an XML backup in a hardcoded directory.

            Assignee:
            Unassigned
            Reporter:
            Jeff Turner
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: