DC Migration - export/import results in missing pull request links on the target instance

XMLWordPrintable

    • Type: Bug
    • Resolution: Unresolved
    • Priority: Low
    • None
    • Affects Version/s: 7.2.4, 7.13.0
    • None
    • 7
    • Severity 3 - Minor
    • 7

      Issue Summary

      Pull request links are missing after a DC Migration (Server to Server)

      Steps to Reproduce

      1. Prepare two Bitbucket instances (source and target)
      2. Create a Pull Request on the source instance and merge it
      3. Navigate to the merge commit created from the PR.  The PR link is visible.
      4. Export all projects from the source instance
      5. Import the projects to the target instance
      6. On the target instance, navigate to the merge commit created from step#2. The PR link is missing.

      Expected Results

      PR link should be visible, similar to the source.

      Actual Results

      PR link is missing

      Workaround

      1. Stop the target instance
      2. Delete the following file in the target instance
        {BITBUCKET_HOME}/shared/config/upgrades/core-backfill-pull-request-commits
      3. OPTIONAL: Enable DEBUG logging for
        com.atlassian.stash.internal.pull.PullRequestCommitBackfillJob
      4. Start the target instance

        1. source.png
          source.png
          204 kB
        2. target.png
          target.png
          201 kB

            Assignee:
            Unassigned
            Reporter:
            Aedrian Escultura (Inactive)
            Votes:
            2 Vote for this issue
            Watchers:
            5 Start watching this issue

              Created:
              Updated: