Previous pipelines runs show incorrect build minutes calculation

XMLWordPrintable

    • 1
    • Severity 3 - Minor
    • 5

      Issue Summary

      • When individual steps are re-ran, the total build minutes used figure on the latest run will be correct - but for previous runs, the figure will be incorrectly calculated

      Steps to Reproduce

      1. Run a build that has multiple steps (having size options makes it more apparent ie 2x/4x)
      2. Stop the build in the middle of a step
      3. Select Rerun > Rerun stopped steps
      4. Repeat this a few times so you have multiple runs
      5. Mouse over the usage on the latest run, and compare these with previous runs - the current run will be correctly calculated as the sum of all build times, whereas previous runs will show inaccurate figures

      Expected Results

      • The most recent run, and all previous runs will show accurate total build minute calculations

      Actual Results

      • Only the most recent run has an accurate total build minute calculation

      Workaround

      • Ignore the figures reported by previous runs, refer only to the most recent run

              Assignee:
              Unassigned
              Reporter:
              Ben
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: