Description
When I create a plan I don't necessarily want to let it build.
I wanted to set up three very long running builds which rely on a single resource that can't be run in parallel ( a vmware image). I want one scheduled for low load times and want the other two to be triggered in turn.
I can do all of this except when I create one it starts building immediately regardless of the chosen trigger mechanism.
Attachments
Issue Links
- is blocked by
-
BAM-1045 Option to kick off build after saving a plan create/update
- Closed