-
Suggestion
-
Resolution: Won't Do
-
None
-
None
-
0
-
1
-
Currently if the build is running, all its Jobs will run using the same code revision.
However, if one of the first Jobs/Stages change the code repository (new commit) and we would like next Stage to use these changes (have them checked-out from the new revision), it is not possible, because all Jobs will use the same revision that was initially detected by the Plan.
It would be interesting to allow the Plan to continue interacting with the repository and detecting new revisions as the build runs.
A check box in the plan would be enough to enable/disable a detection of new revisions.
- is related to
-
BAM-10051 Allow Perforce to continue using the Workspace as Working Directory when the Checkout Task is removed
- Closed