Build duration of a plan with manual stage is incorrect

XMLWordPrintable

    • Type: Bug
    • Resolution: Fixed
    • Priority: Low
    • 9.6.1
    • Affects Version/s: allversions
    • Component/s: Builds
    • 1
    • Severity 3 - Minor
    • 1

      Issue Summary

      When a Build contains a manual stage, the build duration is not calculated correctly.

      This is reproducible on Data Center:

      Steps to Reproduce

      1. Add a manual stage to a build that has known build duration.
      2. Run the build.
      3. Wait 10 minutes before triggering the manual stage.
      4. Trigger the manual stage.

      in the above scenario the queue time are considered negligible.

      Expected Results

      The build should have the previous build duration + 10 minutes

      Actual Results

      The build the build duration is much higher.

      Workaround

      Currently there is no known workaround for this behavior. A workaround will be added here when available

            Assignee:
            Mateusz Szmal
            Reporter:
            Zaro (Inactive)
            Votes:
            15 Vote for this issue
            Watchers:
            6 Start watching this issue

              Created:
              Updated:
              Resolved: