Plan run customized, but after certain task is finished

XMLWordPrintable

    • 0

      Need to change some plan variables at build specific execution time. If there's a feature at run customized pop-up window that says: wan to run costumized starting from a specific task(otherwise it runs normal). for my example, I have a plan that runs with specific plan varaibles, and I need some of those variables to be changed after some task is finished, and then I would like next task to use those newly changed variables.  

              Assignee:
              Unassigned
              Reporter:
              Night Watch
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: