Possibility to override concurrent build value when a build is triggered manually

XMLWordPrintable

    • 0
    • 1

      Problem Definition

      Currently, it is not possible to trigger a build manually when the concurrency limit is reached. When multiple jobs are running triggered by to automatic trigger reaching the concurrency threshold and if we want to trigger a manual build, they have to wait in the queue until the ongoing build gets over.

      Suggested Solution

      There should be an option in Overview -> Concurrent builds page to allow/deny manual builds to override the allowed concurrent builds.

      Why this is important

      Introducing this will enable users to trigger a manual build instantly instead of waiting for the ongoing build to get over.

            Assignee:
            Unassigned
            Reporter:
            Jeyanthan I (Inactive)
            Votes:
            2 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: