Details
-
Bug
-
Resolution: Unresolved
-
Low
-
None
-
5.9.4
-
2
-
Severity 3 - Minor
-
0
-
Description
Summary
Manually running Stages with different users create incorrect Stage's metadata
Steps to Reproduce
- Create 3 stages; First Stage, Second Stage (need Manual run), Third Stage (need Manual run)
- User1 run the plan manually
- User2 run the Second Stage
- User3 run the Third Stage
Expected Results
ManualBuildTriggerReason metadata will show the correct Stage Name and the user who run it
http://localhost:8085/browse/BAM-GITH-7/metadata
ManualBuildTriggerReason.userName: User1
http://localhost:8085/browse/BAM-GITH-JOB-7/metadata
ManualBuildTriggerReason.stageName: First stage ManualBuildTriggerReason.userName: User1
http://localhost:8085/browse/BAM-GITH-JOB2-7/metadata
ManualBuildTriggerReason.stageName: Second stage ManualBuildTriggerReason.userName: User2
http://localhost:8085/browse/BAM-GITH-JOB3-7/metadata
ManualBuildTriggerReason.stageName: Third stage ManualBuildTriggerReason.userName: User3
Actual Results
http://localhost:8085/browse/BAM-GITH-7/metadata
ManualBuildTriggerReason.stageName: Third stage ManualBuildTriggerReason.userName: User3
http://localhost:8085/browse/BAM-GITH-JOB-7/metadata
ManualBuildTriggerReason.userName: User1
http://localhost:8085/browse/BAM-GITH-JOB2-7/metadata
ManualBuildTriggerReason.userName: User1
http://localhost:8085/browse/BAM-GITH-JOB3-7/metadata
ManualBuildTriggerReason.stageName: Second stage ManualBuildTriggerReason.userName: User1
Attachments
Issue Links
- is duplicated by
-
BAM-18196 Add a variable with the username who manually trigger the stage
- Gathering Interest
- is related to
-
BAM-19679 Incorrect job result metadata after build re-run
- Closed
- was cloned as
-
BDEV-10163 Loading...