Add skip conditions to control the flow of Bamboo Stage execution

XMLWordPrintable

    • Type: Suggestion
    • Resolution: Duplicate
    • None
    • Component/s: Stages

      This feature will allow skipping any Stage of a Plan during execution Based on a condition. For example, when configuring a skip condition on a Stage, users can have something like these: "If the branch name is 'test_branch', skip this Stage", "If it's 9am to 6pm now, skip this Stage", "If the Plan is triggered manually, skip this Task".

      Skip this Stage based on:

      1. time interval
      2. how the Plan (and therefore the Stage) has been triggered
      3. who triggered the Plan/Stage (list of user names or groups)
      4. who committed changes to the Configured Repositories for this Plan(Stage)
      5. what branch is running the Stage (the user can specify a list of branch names, or set a regular expression)
      6. the Agent or Environment (user can specify the agent name)

      (This list can be expanded)

              Assignee:
              Unassigned
              Reporter:
              ArmenA
              Votes:
              1 Vote for this issue
              Watchers:
              12 Start watching this issue

                Created:
                Updated:
                Resolved: