Details
-
Suggestion
-
Resolution: Unresolved
-
None
-
None
-
0
-
1
-
Description
The default Trigger condition : Only run Build if other Plans are currently passing is not respected.
I setup a manual build strategy with a trigger condition pointing to a top level plan - I made sure the last build on the other plan had failed and then requested a build on the current plan. The plan still gets executed without checking the other plan status.