Quiet Period is not respected if Maximum Retries is set to "1"

XMLWordPrintable

    • Type: Bug
    • Resolution: Duplicate
    • Priority: Low
    • None
    • Affects Version/s: 3.4.3
    • Component/s: Quiet Period, Triggers
    • None
    • 2
    • Severity 3 - Minor
    • 0

      If the Quiet Period "Maximum Retries" is set to 1 (one), the build is run immediately and it does not wait the Quiet Period.

              Assignee:
              Unassigned
              Reporter:
              Renan Battaglin (Inactive)
              Votes:
              3 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: