Details
-
Bug
-
Resolution: Duplicate
-
Low
-
None
-
3.4.3
-
None
-
2
-
Severity 3 - Minor
-
0
-
Description
If the Quiet Period "Maximum Retries" is set to 1 (one), the build is run immediately and it does not wait the Quiet Period.
Attachments
Issue Links
- duplicates
-
BAM-22314 A Repository with 'Enable quiet period' and with 'Maximum retries' set 1 does not put the Build PlanExec to sleep
- Closed