-
Sub-task
-
Resolution: Done
-
None
-
None
-
None
As a user, I'd like to have the ability to create an issue inside the sprint at the Next-Gen project.
Currently, when creating a new issue through + sign on blue left toolbar there is no option to add the issue to a sprint, it will automatically move to the backlog and then I need to drag and drop the card inside the sprint.
It would be great to have the feature to assign the issue into an existing sprint for the Next-Gen project.