Scheduled backups that fail to complete within a certain time period should provide indications

XMLWordPrintable

      NOTE: This suggestion is for JIRA Cloud. Using JIRA Server? See the corresponding suggestion.

      Backups that fail to complete within a specified time period (can be decided either programmatically or by the user) should provide some level of warning within the web interface that they have failed. This is a critical operation, and failure to complete backups is a very high-risk situation.

      For information about how backups can potentially fail, see JRA-18018. In this case, I've been able to cause the backup-process to hang indefinitely through high packet loss between the JIRA instance and the MS SQL server

              Assignee:
              Unassigned
              Reporter:
              Philip Peitsch
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: