Uploaded image for project: 'Migration Platform'
  1. Migration Platform
  2. MIG-1142

It would be great if my attachments could be front loaded before a migration.

    XMLWordPrintable

Details

    • Our product teams collect and evaluate feedback from a number of different sources. To learn more about how we use customer feedback in the planning process, check out our new feature policy.

    Description

      Summary

      It would be great if my attachments could be front loaded before a migration.

      Details

      1. Attachments are migrated along with the spaces (CCMA) and projects (JCMA) and have to be uploaded after the migration in site-import.
      2. These attachments are usually large in size and the upload time is quite significant.

      It would be a big time saver if these were uploaded before the migration and linked during the prod migration.

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              vgambhir Vik
              Votes:
              1 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: