-
Suggestion
-
Resolution: Unresolved
-
27
-
18
-
-
Referencing the official documentation:
https://confluence.atlassian.com/display/GH/Transitioning+an+Issue
it's currently not possible to drag&drop multiple issues in work mode.
We'd like to be able to use this feature to "bulk-move" deployed issues to the test column (just one use case.)
The request originated here:
https://answers.atlassian.com/questions/194081/drag-multiple-issues-in-greenhopper-transition
- is duplicated by
-
JSWSERVER-5847 Unable to move multiple tickets at a time between Rapid Board (Work) columns
- Closed
-
JSWSERVER-11244 Work mode: allow Drag and Drop BULK transition (as in Plan mode)
- Closed
- duplicates
-
JDEV-37004 Failed to load
- mentioned in
-
Page Failed to load
-
Page Failed to load
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
Form Name |
---|
Hi! This is from 2013 and Atlassian got "Future Consideration" yet. Maybe 2021? Eight years? For those that paied for a license that's not an option. That's why we consider not pay for support renewal and maybe buy a new version ten years later, if it worth.
Removing my vote. I don't believe it'll be made anymore. Good lucky.