• Hide

      Atlassian Status as at 11 February 2016

      This feature is now available for both JIRA Software Cloud and JIRA Software Server.
      The server release version is 7.1.0, please see the server release notes for further details.

      Kind regards,
      Martin
      JIRA Software

      Show
      Atlassian Status as at 11 February 2016 This feature is now available for both JIRA Software Cloud and JIRA Software Server. The server release version is 7.1.0, please see the server release notes for further details. Kind regards, Martin JIRA Software
    • We collect Jira feedback from various sources, and we evaluate what we've collected when planning our product roadmap. To understand how this piece of feedback will be reviewed, see our Implementation of New Features Policy.

      As a user It would be great if I can have reopen sprint functionality in rapid board

      There are few times that user is accidentally closed sprint and there is no re-open sprint functionality other than creating a new sprint and re-add issues from the previous sprint into a new sprint.

        1. complete-sprint.png
          complete-sprint.png
          65 kB
        2. DatabaseModification#1.png
          DatabaseModification#1.png
          88 kB
        3. DatabaseModification#2.png
          DatabaseModification#2.png
          78 kB
        4. JIRA Agile Most Voted.jpg
          JIRA Agile Most Voted.jpg
          388 kB
        5. screenshot-1.png
          screenshot-1.png
          78 kB

            [JSWSERVER-7804] Ability to reopen a sprint

            Bug was created for those interested in enhancing this: JSWSERVER-15859

            Andrew Dunmore added a comment - Bug was created for those interested in enhancing this:  JSWSERVER-15859

            andrew.dunmore - Atlassian Support will assist with this and create an issue if there is a Bug, they will advise of this on your support request.

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - andrew.dunmore - Atlassian Support will assist with this and create an issue if there is a Bug, they will advise of this on your support request. Kind regards, Martin JIRA Software

            I was able to find a workaround. Bulk update a single story into the sprint --> reopen it. It was able to get me through the problem, but I would think this should become a defect / enhancement longer-term since we should probably be able to re-open and empty sprint that is closed.

            Andrew Dunmore added a comment - I was able to find a workaround. Bulk update a single story into the sprint --> reopen it. It was able to get me through the problem, but I would think this should become a defect / enhancement longer-term since we should probably be able to re-open and empty sprint that is closed.

            Andrew Dunmore added a comment - - edited

            ERROR:  Is there an issue out there to track this?  I entered a support ticket today.

             

            Reopening the sprint is not possible because there are no issues in this sprint.

             

            Andrew Dunmore added a comment - - edited ERROR :  Is there an issue out there to track this?  I entered a support ticket today.   Reopening the sprint is not possible because there are no issues in this sprint.  

            This feature is now available for both JIRA Software Cloud and JIRA Software Server.
            The server release version is 7.1.0, please see the server release notes for further details.

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - This feature is now available for both JIRA Software Cloud and JIRA Software Server. The server release version is 7.1.0, please see the server release notes for further details. Kind regards, Martin JIRA Software

            ekurt - it is already available in JIRA Software cloud and will be available in the next major release of JIRA Software server, I'll update this issue with the version and release date in due course.

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - ekurt - it is already available in JIRA Software cloud and will be available in the next major release of JIRA Software server, I'll update this issue with the version and release date in due course. Kind regards, Martin JIRA Software

            ekurt - please see Reopening a sprint

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - ekurt - please see Reopening a sprint Kind regards, Martin JIRA Software

            Erdal Kurt added a comment - - edited

            i can reopen cosed before sprints(cloudversion)??
            Sorry, for beeing unclear
            wanted to say, it works for Cloudversion i think since this year
            It's not clear for me wether this request was for Server or Cloud

            Erdal Kurt added a comment - - edited i can reopen cosed before sprints(cloudversion)?? Sorry, for beeing unclear wanted to say, it works for Cloudversion i think since this year It's not clear for me wether this request was for Server or Cloud

            M Bhuiyan added a comment -

            Waiting for resolve asap.

            M Bhuiyan added a comment - Waiting for resolve asap.

            mvdkleijn - it will be available in the next major release of JIRA Software server. I cannot give a date at present but as a guideline it should be the first quarter of 2016.

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - mvdkleijn - it will be available in the next major release of JIRA Software server. I cannot give a date at present but as a guideline it should be the first quarter of 2016. Kind regards, Martin JIRA Software

            When will the re-open sprint feature be available for JIRA Software server?

            Deleted Account (Inactive) added a comment - When will the re-open sprint feature be available for JIRA Software server?

            That's cool ! At long last
            Thanks @martin_jopson !

            Gael Trinquart added a comment - That's cool ! At long last Thanks @martin_jopson !

            dross - thanks for adding the link above.

            Additional documentation can be found in the JIRA Software Cloud space at https://confluence.atlassian.com/display/JIRASOFTWARECLOUD/Reopening+a+sprint

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - dross - thanks for adding the link above. Additional documentation can be found in the JIRA Software Cloud space at https://confluence.atlassian.com/display/JIRASOFTWARECLOUD/Reopening+a+sprint Kind regards, Martin JIRA Software

            David Ross added a comment -

            For those of you looking for documentation on how to reopen a sprint, it's mentioned in the following update from Oct 25-31 in the Cloud Documentation: https://confluence.atlassian.com/cloud/25-october-2015-to-31-october-2015-785619063.html (see the section at the top called "reopen sprints".

            Basically, you navigate to the Sprint Report for the sprint you want to reopen, and there is a new link on the far right side of the sprint report header that says "Reopen Sprint". Click on that, you will be given a warning screen that lists the issues that will be part of the reopened sprint, and then click "Reopen" to confirm. It's as simple as that.

            David Ross added a comment - For those of you looking for documentation on how to reopen a sprint, it's mentioned in the following update from Oct 25-31 in the Cloud Documentation: https://confluence.atlassian.com/cloud/25-october-2015-to-31-october-2015-785619063.html (see the section at the top called "reopen sprints". Basically, you navigate to the Sprint Report for the sprint you want to reopen, and there is a new link on the far right side of the sprint report header that says "Reopen Sprint". Click on that, you will be given a warning screen that lists the issues that will be part of the reopened sprint, and then click "Reopen" to confirm. It's as simple as that.

            Matt Wynn added a comment -

            Hi Martin,

            Can you point us in the direction of some docs that show how to use the feature?

            I'm a JIRA Cloud customer but I can't see the option currently (it's probably just me not looking hard enough).

            Thanks
            Matt

            Matt Wynn added a comment - Hi Martin, Can you point us in the direction of some docs that show how to use the feature? I'm a JIRA Cloud customer but I can't see the option currently (it's probably just me not looking hard enough). Thanks Matt

            Claudio Gomes added a comment - - edited

            yay, persistance pays. It took two years, the software even changed its name (JIRA cloud) but finally the functionality is there. Thanks guys!

            Claudio Gomes added a comment - - edited yay, persistance pays. It took two years, the software even changed its name (JIRA cloud) but finally the functionality is there. Thanks guys!

            This feature is now available in JIRA Software Cloud. It will be available for JIRA Software Server in a forthcoming release.

            Kind regards,
            Martin
            JIRA Software

            Martin (Inactive) added a comment - This feature is now available in JIRA Software Cloud. It will be available for JIRA Software Server in a forthcoming release. Kind regards, Martin JIRA Software

            +1. I created a test sprint to verify some changes to workflow and board, and now the sprint is going to count against my velocity. So this isn't just for accidents.

            Peter Kazmir added a comment - +1. I created a test sprint to verify some changes to workflow and board, and now the sprint is going to count against my velocity. So this isn't just for accidents.

            I'll add my support for this feature. My scrum masters often misname or close sprints before they should be. Being able to reopen a sprint would be very helpful. Right now Jira is dictating process instead of being a useful tool.

            Thanks,
            Joel BC

            Joel Bancroft-Connors added a comment - I'll add my support for this feature. My scrum masters often misname or close sprints before they should be. Being able to reopen a sprint would be very helpful. Right now Jira is dictating process instead of being a useful tool. Thanks, Joel BC

            Minds added a comment -

            only via database manipulation in current version...

            From a support thread GHS-21083:

            Hey,
            It is possible upon performing an update on the database. Personally I don't recommend doing this, since manual database operations can cause JIRA to be on a inconsistent state, however I can give you the steps and then you decide if this is better or not to perform this. Thus, please find below the steps to re-open a sprint already closed:

            1. Shutdown JIRA
            2. Keep a database backup! The next step will require an update on database
            3. Run the following update:
              update "AO_60DB71_SPRINT" set "COMPLETE_DATE" = NULL, "CLOSED" = 'f' where "ID"=<ID_OF_THE_SPRINT>
            4. Restart JIRA and re-index your instance.

            Once again, please note that the steps above are not recommended, as they were not evaluated on large instances and they might have some unknown side effects, however they can be helpful to you, as actually there is not many options to edit a closed sprint. Furthermore, there is also a popular feature request to allow Sprints closed to be re-opened (and then edited), available on the following link:

            Please feel free to vote and add any comments on it. As you can there it is a very desired feature to JIRA Agile (more than 500 votes) and hopefully it will be implemented soon.

            Also, feel free to raise any questions.

            Regards,
            Arthur Gonçalves | Atlassian Support

            Minds added a comment - only via database manipulation in current version... From a support thread GHS-21083 : Hey, It is possible upon performing an update on the database. Personally I don't recommend doing this, since manual database operations can cause JIRA to be on a inconsistent state, however I can give you the steps and then you decide if this is better or not to perform this. Thus, please find below the steps to re-open a sprint already closed: Shutdown JIRA Keep a database backup! The next step will require an update on database Run the following update: update "AO_60DB71_SPRINT" set "COMPLETE_DATE" = NULL, "CLOSED" = 'f' where "ID"=<ID_OF_THE_SPRINT> Restart JIRA and re-index your instance. Once again, please note that the steps above are not recommended, as they were not evaluated on large instances and they might have some unknown side effects, however they can be helpful to you, as actually there is not many options to edit a closed sprint. Furthermore, there is also a popular feature request to allow Sprints closed to be re-opened (and then edited), available on the following link: https://jira.atlassian.com/browse/GHS-7804 Please feel free to vote and add any comments on it. As you can there it is a very desired feature to JIRA Agile (more than 500 votes) and hopefully it will be implemented soon. Also, feel free to raise any questions. Regards, Arthur Gonçalves | Atlassian Support

            How difficult is to enable a function like this?

            Is there any workaround?

            Wilson Soethe Cursino added a comment - How difficult is to enable a function like this? Is there any workaround?

            The feature to re-open an accidentally closed sprint is MUST MUST.

            If Atlassian is not planning to fix this in near future, please AT LEAST share a workaround or even a way to make changes at database-level on the backend to re-instate the sprint to running status.

            Accidental closure on JIRA Agile cannot disrupt our release progress. Please do the needful at the earliest.

            Sanjeev Kumar A C added a comment - The feature to re-open an accidentally closed sprint is MUST MUST. If Atlassian is not planning to fix this in near future, please AT LEAST share a workaround or even a way to make changes at database-level on the backend to re-instate the sprint to running status. Accidental closure on JIRA Agile cannot disrupt our release progress. Please do the needful at the earliest.

            andy added a comment -

            you would think this is an obvious feature. A lot of wasted time recovering if someone mistakenly clicks a button.

            andy added a comment - you would think this is an obvious feature. A lot of wasted time recovering if someone mistakenly clicks a button.

            this feature is a must

            Louis-Guillaume Carrier-Bédard added a comment - this feature is a must

            I just had to run through the (most excellent) support team to handle this function. I am a bit disenchanted to see that the request to make this a user feature is almost 2.5 years old.

            Brian Cooper added a comment - I just had to run through the (most excellent) support team to handle this function. I am a bit disenchanted to see that the request to make this a user feature is almost 2.5 years old.

            Atlassian is taking a big hit on its reputation.
            2 years, an undo is still not yet even planned...

            Gael Trinquart added a comment - Atlassian is taking a big hit on its reputation. 2 years, an undo is still not yet even planned...

            I don't understand why this isn't a feature, it just makes no sense.

            Scenario; I had a story with sub-tasks, which we thought would be done in a single sprint. It wasn't. So we changed the story to an Epic, and the sub-tasks to issues so that they could be split across two sprints. I can now no longer add the completed tasks to the complete sprint and my JIRA current sprint and backlog now makes no sense whatsoever, with tasks in there which were completed in the previous sprint.

            Lee Barnard added a comment - I don't understand why this isn't a feature, it just makes no sense. Scenario; I had a story with sub-tasks, which we thought would be done in a single sprint. It wasn't. So we changed the story to an Epic, and the sub-tasks to issues so that they could be split across two sprints. I can now no longer add the completed tasks to the complete sprint and my JIRA current sprint and backlog now makes no sense whatsoever, with tasks in there which were completed in the previous sprint.

            Users are having a big problem with not being able to re-open a spint. If there this will never be a feature in Jira, please let us know. People make silly mistakes and need to be able to "Undo" their mistakes in using Jira.

            Asif Ahmed added a comment - Users are having a big problem with not being able to re-open a spint. If there this will never be a feature in Jira, please let us know. People make silly mistakes and need to be able to "Undo" their mistakes in using Jira.

            if an issue like this is unassigned how can we get it assigned?
            i mean we have 532 votes for this functionality - surely this must mean it is a feature that we require???
            Please do something about this Atlassian!!!!

            Lucille Green added a comment - if an issue like this is unassigned how can we get it assigned? i mean we have 532 votes for this functionality - surely this must mean it is a feature that we require??? Please do something about this Atlassian!!!!

            Jolie Roy added a comment -

            Please please please!!!!! This is an actual issue with my company - sometimes we need to reopen the sprint and are hog-tied with the lack of this functionality!

            Thanks in advance!

            Jolie Roy added a comment - Please please please!!!!! This is an actual issue with my company - sometimes we need to reopen the sprint and are hog-tied with the lack of this functionality! Thanks in advance!

            UPVOTE. I accidentally closed this off too early and now our sprint is all messed up. I can't believe this isn't fixed.

            Forrest Zeisler added a comment - UPVOTE. I accidentally closed this off too early and now our sprint is all messed up. I can't believe this isn't fixed.

            I will add to the comments here. I consider this a bug, at least a usability bug.

            scott ocamb added a comment - I will add to the comments here. I consider this a bug, at least a usability bug.

            Votes: 509
            Please escalate this request - the number of Votes certainly justifies it.

            Vincent Kurutza added a comment - Votes: 509 Please escalate this request - the number of Votes certainly justifies it.

            I am also highly disappointed from the fact that JIRA devs / business need 2+ years .. AND it is still NOT fixed ....

            Biser Simeonov added a comment - I am also highly disappointed from the fact that JIRA devs / business need 2+ years .. AND it is still NOT fixed ....

            husseiny added a comment -

            Wow! I didn't realize this has been around for 2 years already. Any plans to make the update? or should we wait for Slack to enter this market as well and take over the space?

            husseiny added a comment - Wow! I didn't realize this has been around for 2 years already. Any plans to make the update? or should we wait for Slack to enter this market as well and take over the space?

            herarg1, thanks for your comment.
            JIRA Agile 6.6.70 and newer versions now separate the Complete Sprint and sprint editing functionality. Complete Sprint is available on Active Sprints (work mode) but the editing of a sprint name or dates is now done only in the Backlog (plan mode). This should address the concern you raise regarding accidental closure of the sprint due to these actions being in the same small dialog.
            A screenshot and details of the newer Complete Sprint action can be seen at https://confluence.atlassian.com/display/AGILE/Ending+a+Sprint
            Details for editing are at https://confluence.atlassian.com/display/AGILE/Editing+or+Reordering+a+Sprint#EditingorReorderingaSprint-Editingasprint

            Kind regards,
            Martin
            JIRA Agile

            Martin (Inactive) added a comment - herarg1 , thanks for your comment. JIRA Agile 6.6.70 and newer versions now separate the Complete Sprint and sprint editing functionality. Complete Sprint is available on Active Sprints (work mode) but the editing of a sprint name or dates is now done only in the Backlog (plan mode). This should address the concern you raise regarding accidental closure of the sprint due to these actions being in the same small dialog. A screenshot and details of the newer Complete Sprint action can be seen at https://confluence.atlassian.com/display/AGILE/Ending+a+Sprint Details for editing are at https://confluence.atlassian.com/display/AGILE/Editing+or+Reordering+a+Sprint#EditingorReorderingaSprint-Editingasprint Kind regards, Martin JIRA Agile

            Gesner Herard added a comment - - edited

            I believe the option to "Allow reopen only for cases where: A subsequent sprint has not been started (and parallel sprints feature disabled)" would satisfy a large percentage of our needs as the need to re-open the sprint is usually immediately after "Accidental" closure.

            Further, I also believe the accidental closure problem can be avoided or reduced significantly by making a simple usability/consistency design change(s) to the UI when changing sprint name or dates while in "Work Mode".
            For instance, If user modifies either parameter, then:

            1. Hide or disable the "Submit Sprint" button and replace with "Acknowledge Changes" button, or submit/cancel changes buttons.
            2. Upon submitting/canceling modifications, replace with "Submit Sprint" button or just close the pop-up and default to "Submit Sprint" when re-opened.

            The extra step only applies when user modifies original values; and will add an extra layer of protection against accidental closure due to natural human tendency.

            Gesner Herard added a comment - - edited I believe the option to "Allow reopen only for cases where: A subsequent sprint has not been started (and parallel sprints feature disabled)" would satisfy a large percentage of our needs as the need to re-open the sprint is usually immediately after "Accidental" closure. Further, I also believe the accidental closure problem can be avoided or reduced significantly by making a simple usability/consistency design change(s) to the UI when changing sprint name or dates while in "Work Mode". For instance, If user modifies either parameter, then: Hide or disable the "Submit Sprint" button and replace with "Acknowledge Changes" button, or submit/cancel changes buttons. Upon submitting/canceling modifications, replace with "Submit Sprint" button or just close the pop-up and default to "Submit Sprint" when re-opened. The extra step only applies when user modifies original values; and will add an extra layer of protection against accidental closure due to natural human tendency.

            Thanks for your additional feedback and comments, we understand this issue is important to many of you.

            Previously we implemented GHS-6332 to help reduce the number of accidentally closed sprints. This name of the person who closed a sprint is now visible in the Sprint Report. This may help for cases that just need a social interaction.

            We acknowledge that there is currently no simple workaround in the user interface, however this issue is tracked as a Suggestion since it is being tracked by the product team and not the bugfix team.

            There is potential complexity around manipulation of the sprint and its issues once closed, for example:

            • How do we deal with stories that were in a closed sprint, were incomplete and returned to the backlog, and are now in a new sprint (future or active)?
            • What considerations must be made when parallel sprints are disabled and a subsequent sprint has been started.

            Initially we would look to solve simple cases, as the main use-case is correcting the accidental closure of the sprint. A potential solution might be as follows.
            Allow reopen only for cases where:

            • A subsequent sprint has not been started (and parallel sprints feature disabled)

            Reconstruct the sprint with the completed issues and only issues have not been assigned to another active sprint i.e. we would leave the issues in the active sprint.

            • Issues that are in a future sprint would be taken back for the reopened sprint (essentially removes the future sprint's ID's).
            • Additionally, we would not bring back issues that were removed from the sprint before its closure.
            • Only ‘retrieve' issues from the backlog or future sprints. So if an incomplete issue from a reopened sprint was added to an active sprint (or future sprint that was started) we would leave it in that sprint.

            If you have any feedback on this proposed solution please leave a comment below.

            Kind regards,
            Martin
            JIRA Agile

            Martin (Inactive) added a comment - Thanks for your additional feedback and comments, we understand this issue is important to many of you. Previously we implemented GHS-6332 to help reduce the number of accidentally closed sprints. This name of the person who closed a sprint is now visible in the Sprint Report. This may help for cases that just need a social interaction. We acknowledge that there is currently no simple workaround in the user interface, however this issue is tracked as a Suggestion since it is being tracked by the product team and not the bugfix team. There is potential complexity around manipulation of the sprint and its issues once closed, for example: How do we deal with stories that were in a closed sprint, were incomplete and returned to the backlog, and are now in a new sprint (future or active)? What considerations must be made when parallel sprints are disabled and a subsequent sprint has been started. Initially we would look to solve simple cases, as the main use-case is correcting the accidental closure of the sprint. A potential solution might be as follows. Allow reopen only for cases where: A subsequent sprint has not been started (and parallel sprints feature disabled) Reconstruct the sprint with the completed issues and only issues have not been assigned to another active sprint i.e. we would leave the issues in the active sprint. Issues that are in a future sprint would be taken back for the reopened sprint (essentially removes the future sprint's ID's). Additionally, we would not bring back issues that were removed from the sprint before its closure. Only ‘retrieve' issues from the backlog or future sprints. So if an incomplete issue from a reopened sprint was added to an active sprint (or future sprint that was started) we would leave it in that sprint. If you have any feedback on this proposed solution please leave a comment below. Kind regards, Martin JIRA Agile

            Alex Rowley added a comment - - edited

            From what I can see the grasshopper API allows the sprint name, start date and end date to be altered even when a sprint has been closed.

            Do a PUT request to server/rest/greenhopper/1.0/sprint/sprintId/
            with the following JSON data:

            { "name": "Extended Sprint 17", "startDate": "19/Apr/13 5:00 PM", "endDate": "5/May/13 5:00 PM" }

            (replace server and sprintId with your own)

            This solves some peoples problems on this issue regarding start date and name changes. Unfortunately due to a bug with how Jira uses the end date it doesn't resolve the issue for people who want to edit that. The end date will be updated but it is not the end date that is used for the reports. It is the completion date.

            For more info see the below extract from the JSON representation of a sprint:
            "startDate": "06/Jan/15 11:52 PM",
            "endDate": "13/Jan/15 11:53 PM",
            "completeDate": "06/Mar/15 1:10 AM",

            Although the end date is set and can be modified using the above API call, the complete date can't be changed.
            I'm not sure if the bug is that the reports use the completeDate as the endDate, that the completeDate can't be modified, or even that the endDate is named incorrectly but there is definitely a bug here.

            Alex Rowley added a comment - - edited From what I can see the grasshopper API allows the sprint name, start date and end date to be altered even when a sprint has been closed. Do a PUT request to server/rest/greenhopper/1.0/sprint/sprintId/ with the following JSON data: { "name": "Extended Sprint 17", "startDate": "19/Apr/13 5:00 PM", "endDate": "5/May/13 5:00 PM" } (replace server and sprintId with your own) This solves some peoples problems on this issue regarding start date and name changes. Unfortunately due to a bug with how Jira uses the end date it doesn't resolve the issue for people who want to edit that. The end date will be updated but it is not the end date that is used for the reports. It is the completion date. For more info see the below extract from the JSON representation of a sprint: "startDate": "06/Jan/15 11:52 PM", "endDate": "13/Jan/15 11:53 PM", "completeDate": "06/Mar/15 1:10 AM", Although the end date is set and can be modified using the above API call, the complete date can't be changed. I'm not sure if the bug is that the reports use the completeDate as the endDate, that the completeDate can't be modified, or even that the endDate is named incorrectly but there is definitely a bug here.

            @Martin It is also a question how much Atlassian is (really) listening to their users, and how is this perceived.
            So Rainer's suggestion is valid from a user that feels being ignored!

            Triggered by your comment I will check how our organisation and our JIRA users are feeling about this issue.
            Kind Regards, Milan

            Milan Sijan added a comment - @Martin It is also a question how much Atlassian is (really) listening to their users, and how is this perceived. So Rainer's suggestion is valid from a user that feels being ignored! Triggered by your comment I will check how our organisation and our JIRA users are feeling about this issue. Kind Regards, Milan

            @ Martin:

            Thanks for your comment, Martin. We appreciate the contact regarding this issue. Would be interested to understand why this may be considered a suggestion vs. an issue/bug? If there are known workarounds, that would be spectacular to learn...

            This is a very similar workflow to putting an issue into the "Closed" state. Atlassian developed a way to reopen bugs/issues/improvements after they've been closed because there is a major customer use case for this. We are only asking for the same functionality for Sprints as a whole. When something is closed it is possible that it will need to be reopened in the future for one reason or another. I know it probably messes up all of the post-sprint-closing-metric calculations, so it's a PM decision on that point.

            Anyways, appreciate your note.

            Mike Premo added a comment - @ Martin: Thanks for your comment, Martin. We appreciate the contact regarding this issue. Would be interested to understand why this may be considered a suggestion vs. an issue/bug? If there are known workarounds, that would be spectacular to learn... This is a very similar workflow to putting an issue into the "Closed" state. Atlassian developed a way to reopen bugs/issues/improvements after they've been closed because there is a major customer use case for this. We are only asking for the same functionality for Sprints as a whole. When something is closed it is possible that it will need to be reopened in the future for one reason or another. I know it probably messes up all of the post-sprint-closing-metric calculations, so it's a PM decision on that point. Anyways, appreciate your note.

            Martin Jopson,

            While I do understand there are probably major features the team is working on, I still cannot agree it is acceptable for such a requires to have been logged for over an year and not have been addressed.

            It does affect all Agile users a lot and placeholder answers are not helping prove anyone is acknowledging how big of a problem this is. Thus, people considering the option to contact the CEOs is only natural.

            Best regards,
            Nadia

            Nadia Tosheva added a comment - Martin Jopson, While I do understand there are probably major features the team is working on, I still cannot agree it is acceptable for such a requires to have been logged for over an year and not have been addressed. It does affect all Agile users a lot and placeholder answers are not helping prove anyone is acknowledging how big of a problem this is. Thus, people considering the option to contact the CEOs is only natural. Best regards, Nadia

            rainer mueck, these issues are not being ignored by JIRA product management. An overview of how the JIRA team uses jira.atlassian.com can be found here: https://answers.atlassian.com/questions/110373/how-does-the-jira-team-use-jira-atlassian-com

            Using the Contact the CEOs form is not a recommended or preferred way to comment on a particular Suggestion or backlog item and will not change the priority of the backlog.

            We understand this issue is important to many of you, we see it as a valid Suggestion, however we cannot provide any guidance at this time as to when we'll be implementing it.

            Kind regards,
            Martin
            JIRA Agile

            Martin (Inactive) added a comment - rainer mueck , these issues are not being ignored by JIRA product management. An overview of how the JIRA team uses jira.atlassian.com can be found here: https://answers.atlassian.com/questions/110373/how-does-the-jira-team-use-jira-atlassian-com Using the Contact the CEOs form is not a recommended or preferred way to comment on a particular Suggestion or backlog item and will not change the priority of the backlog. We understand this issue is important to many of you, we see it as a valid Suggestion, however we cannot provide any guidance at this time as to when we'll be implementing it. Kind regards, Martin JIRA Agile

            It seems to be the sad tradition, that the most voted GHS requests keep on being ignored by the JIRA Agile product management (see attached screenshot "JIRA Agile Most Voted.jpg") for a long time.

            I keep on complaining about this fact whenever I meet Atlassian guys.

            Everyone who feels frustrated like me, please go for it and use this method: https://www.atlassian.com/company/contact/contact-ceos

            I did that twice already, but I bet it will make a difference, if dozens of us go that way.

            Rainer Mueck added a comment - It seems to be the sad tradition, that the most voted GHS requests keep on being ignored by the JIRA Agile product management (see attached screenshot "JIRA Agile Most Voted.jpg") for a long time. I keep on complaining about this fact whenever I meet Atlassian guys. Everyone who feels frustrated like me, please go for it and use this method: https://www.atlassian.com/company/contact/contact-ceos I did that twice already, but I bet it will make a difference, if dozens of us go that way.

            LEM added a comment -

            As this issue is open now since two years : please tell us when this will be fixed!

            LEM added a comment - As this issue is open now since two years : please tell us when this will be fixed!

            One of our users has just accidentally closed a sprint. Having got over my disbelief that there's no way to undo this, I think this is a major flaw that needs to be addressed and will certainly make us think about whether we should continue with JIRA agile. Creating a new sprint and manually adding hundreds of issues to it again isn't a viable workaround for us.

            Simon Watson added a comment - One of our users has just accidentally closed a sprint. Having got over my disbelief that there's no way to undo this, I think this is a major flaw that needs to be addressed and will certainly make us think about whether we should continue with JIRA agile. Creating a new sprint and manually adding hundreds of issues to it again isn't a viable workaround for us.

            I am interested very much for this feature.

            Venkata Rao added a comment - I am interested very much for this feature.

            I think we need both. Mistakes happen. We need an easy way to recover from them.

            Scott Ocamb added a comment - I think we need both. Mistakes happen. We need an easy way to recover from them.

            Violette added a comment - - edited

            Ahh found a reason I would like to reopen a sprint. The name is incorrect and I would like to fix the name. If I could fix the name of a closed sprint without reopening the sprint ( and without going into the database) that would be fine too.

            Violette added a comment - - edited Ahh found a reason I would like to reopen a sprint. The name is incorrect and I would like to fix the name. If I could fix the name of a closed sprint without reopening the sprint ( and without going into the database) that would be fine too.

            this is a must!

            Daniel Tenzi added a comment - this is a must!

            This really should be addressed, no way to fix a simple and common 'oops' really seems wrong.

            Derek Sheeman added a comment - This really should be addressed, no way to fix a simple and common 'oops' really seems wrong.

            Mike Premo added a comment -

            For those interested in a UNOFFICIAL way to reopen your sprint, you can modify the JIRA database form associated with the sprint. Mine was called "ao_60db71_sprint.frm" and located in C:\ProgramData\MySQL\MySQL Server 5.5\data\jiradb. I've attached a couple screenshots, but I have successfully modified the start time of my sprint using this method. There is also a CLOSED field, which if you set to 0, it might do the trick.

            Disclaimer: If not careful, be warned that you can mess your database and JIRA instance up this way. Backup first!

            Cheers!

            Mike Premo added a comment - For those interested in a UNOFFICIAL way to reopen your sprint, you can modify the JIRA database form associated with the sprint. Mine was called "ao_60db71_sprint.frm" and located in C:\ProgramData\MySQL\MySQL Server 5.5\data\jiradb. I've attached a couple screenshots, but I have successfully modified the start time of my sprint using this method. There is also a CLOSED field, which if you set to 0, it might do the trick. Disclaimer: If not careful, be warned that you can mess your database and JIRA instance up this way. Backup first! Cheers!

            Mike Premo added a comment -

            Has there been a fix for this yet?

            Mike Premo added a comment - Has there been a fix for this yet?

            Maurits de Boer added a comment - - edited

            I accidentally entered the wrong end date for a sprint and then closed it. Stupid mistake of course and there is no way to revert this It would be great if I can reopen the sprint.

            Maurits de Boer added a comment - - edited I accidentally entered the wrong end date for a sprint and then closed it. Stupid mistake of course and there is no way to revert this It would be great if I can reopen the sprint.

            Avi Gabay added a comment -

            folks, this is a MUST feature !!! im stuck with a closed sprint by accident !!!
            need to have the re-open option !!!

            Avi Gabay added a comment - folks, this is a MUST feature !!! im stuck with a closed sprint by accident !!! need to have the re-open option !!!

            This shouldn't be a "Suggestion" instead a bug in the current world.

            Can someone from Atlassian confirm when they plan to implement this, it's such a nuisance that we can't reopen an accidentally closed Sprint either.

            Madhusudhan Matrubai added a comment - This shouldn't be a "Suggestion" instead a bug in the current world. Can someone from Atlassian confirm when they plan to implement this, it's such a nuisance that we can't reopen an accidentally closed Sprint either.

            This is an important and needed feature. Any ideas when you will be able to work on this?

            Natacha Ribeiro added a comment - This is an important and needed feature. Any ideas when you will be able to work on this?

            +1 Reopening Sprints is a MUST HAVE. Or you add an Undo funciton

            Ferhat Dogru added a comment - +1 Reopening Sprints is a MUST HAVE. Or you add an Undo funciton

              Unassigned Unassigned
              vkharisma vkharisma
              Votes:
              648 Vote for this issue
              Watchers:
              305 Start watching this issue

                Created:
                Updated:
                Resolved: