-
Suggestion
-
Resolution: Unresolved
-
270
-
25
-
When managing multiple teams and boards, it is impractical to manually update each sprint and start/end them individually. It would be much nicer if we could have the following features included in the future;
- The ability to add start and end dates to future sprints.
- The ability to select to automatically start and end sprints based on those dates on a Project-basis (wherever the sprint is housed).
- is duplicated by
-
JRACLOUD-90830 As a Scrum Master, I'd like to Have the Ability to Automatically Start and Stop planned Sprints
- Closed
- is related to
-
JSWSERVER-11569 As a Scrum Master, I'd like to Have the Ability to Automatically Start and Stop planned Sprints
- Closed
- mentioned in
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...
-
Page Loading...