-
Suggestion
-
Resolution: Unresolved
-
54
-
12
-
In a scrum backlog, the story points appear in a badge to the right.
Unfortunately, that is not an option in the kanban backlog. The workaround is to add the story points on a second row via the issue layout. This means that fewer issues fit on the screen at one time, meaning that it's more difficult to navigate the backlog and to interact with it.
Could you please add the story point badges in to the KanPlan view?
Story points in Kanban backlog when field is added to backlog card layout:
Story points in Scrum backlog (note how the field does not consume additional vertical space unlike in Kanban backlog):
- is duplicated by
-
JSWCLOUD-16957 Add Original Estimate field to Kanban Backlogs without consuming more vertical space
- Gathering Interest
- is related to
-
JSWCLOUD-7265 Story Points field should appear as a badge on Kanban board cards (as it does on Scrum boards)
- Gathering Interest