Uploaded image for project: 'Jira Align'
  1. Jira Align
  2. JIRAALIGN-1848

[JIRAALIGN-1848] Estimation: Values are rounded in different ways

    XMLWordPrintable

Details

    • Severity 3 - Minor
    • No

    Description

      Issue Summary

      Estimation: Values are rounded in different ways

      Steps to Reproduce

      1. Login.
      2. For any Portfolio set Estimation System to WSJF
      3. Go to The Epics Backlog.
      4. Click on Estimation.
      5. For Any Epic set WSJF to 13 8 8 8.
        //Notice the WSJF total
      6. Change the Job Size to 5 and back to 8.
        //Notice the WSJF total

      Expected Results

      Value is rounded in the same way in both cases.

      Actual Results

      After Step 5 WSJF is showing 3.62. This value appears throughout the application. 

      After Step 6 WSJF is showing 3.63. 

      Workaround

      Page refresh

      Attachments

        Issue Links

          Activity

            People

              4f593be5d819 Anna Eshlin De Kassal (Inactive)
              rpetrunyak@atlassian.com Roman Petrunyak (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Backbone Issue Sync