Story Points will reset to zero after editing the story points before the actual start of the sprint

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Obsolete
    • Icon: Medium Medium
    • None
    • 6.0.8
    • None

      Steps to reproduce:

      1. Create an issue with story points value.
      2. Create and Start a Sprint, set the start date/time ahead of your system clock (for example 5 min).
      3. Edit the story points for issue (make sure before the planned sprint starts).
      4. Observe the Sprint Report at this point (the story points will reset to zero)

        1. sp.jpeg
          sp.jpeg
          102 kB

              Unassigned Unassigned
              oalsafi OmarA
              Votes:
              10 Vote for this issue
              Watchers:
              6 Start watching this issue

                Created:
                Updated:
                Resolved: