Create default Zoom Parameter for the team calendars macro Timeline View

XMLWordPrintable

    • 0
    • 2

      NOTE: This suggestion is for Confluence Server. Using Confluence Cloud? See the corresponding suggestion.

      Currently there is no parameter I have found for default zoom level for a calendar embedded into a confluence page.
      Specifically I am using timeline view as the default view and it seems to default to all the way zoomed in.

      My goal is to plot where epics will likely fall on a timeline which I can do using custom date fields but when the page is viewed the use must zoom all the way out every time the page is viewed.

      With a set default zoom to 3 month parameter (or even 6 or 12) the viewer would not be required to manually zoom the timeline out every time and would be viewing the timeline as I intend them to view it.

      Related to TEAMCAL-1295
      If the zoom level was remembered for a user they would not have to zoom it out every time, however being able to set the default zoom level from the beginning would also resolve my issue

            Assignee:
            Unassigned
            Reporter:
            Robert Holmes
            Votes:
            45 Vote for this issue
            Watchers:
            28 Start watching this issue

              Created:
              Updated: