If you specify a range from one Date Field to another Date Field, Team Calendar will display the range incorrectly.
Steps to Reproduce
- Create a custom field type called "PlannedStart"
- Create a new issue that uses this custom field, and:
- Set the "Due Date" to "15/01/2015" (15th Jan 2015)
- Set the "PlannedStart" to "13/01/2015" (13th Jan 2015)
- Display a date range for this issue in Team Calendar
Expected Results
Team Calendar should display a range from the 13th to the 15th
Actual Results
Team Calendar starts the event at a certain time on the 13th (in my case it was 11:00AM), and the date range is subsequently longer:
Workaround
Use a Date/Time picker for the fields to be shown in Team Calendar. When a Date/Time picker is used, Team Calendar will display the correct range:
This appears related to TEAMCAL-2718, but I'm raising it as a separate issue in case this is not the same cause.
Attachments
Issue Links
- is related to
-
CONFSERVER-48507 Adjusting the start time for a JIRA Event Range using a Date field increases the range
- Closed
-
CONFSERVER-48914 The time shown is incorrect
- Closed