Details
-
Bug
-
Resolution: Unresolved
-
Low
-
None
-
5.6.6, 5.7.5, 5.8.4
-
2
-
Severity 3 - Minor
-
0
-
Description
Summary
It's not possible to copy an empty task (Task Macro). For example, if we want to use the task macro as a check box on a table, we won't need to write anything on the checkbox, only add it to the table in a specific column. Then, we try to copy this line of the table and paste it, the checkbox (task macro) is not copied.
Steps to Reproduce
- Create a page on Confluence
- Add a table 2x2
- Write something on the first column and add a task macro on the second column, without writing anything after the checkbox added
- Copy this table line
- Paste the line copied on the second line of the table created
Expected Results
- We'll have an exact copy of the first line
Actual Results
- The checkbox of the second column will not be copied
Workaround
- Add a new checkbox instead
Attachments
Issue Links
- mentioned in
-
Page Loading...