[Update July 12, 2024 - This feature is generally available for Jira and Confluence products]

      JOB STORY

      When I already have a sandbox instance created and I want to test changes incrementally

      I want to be able to choose which of the data I bring over from my production environment

      So that I do not have to do an entire reset of my sandbox to test the changes

      Data may include but is not limited to:

      • Global and product configuration settings
      • Users and groups
      • Product content, including Jira issue data and/or Confluence page data

            Assignee:
            Shayka Zarrin
            Reporter:
            Veera (Inactive)
            Votes:
            55 Vote for this issue
            Watchers:
            69 Start watching this issue

              Created:
              Updated:
              Resolved: