-
Bug
-
Resolution: Fixed
-
High
-
1.0-beta
-
None
When I manually trigger a build - even if the build is a scheduled build, the 'changes' tab does not display the changelists that went into that build.
The perforce directory did have the latest code changes - so a sync was definitely performed.
We really would like to see what changes go into each and every build, even if it is manually triggered.
- duplicates
-
BAM-1096 Change the way bamboo detects changes in perforce
-
- Closed
-