-
Bug
-
Resolution: Fixed
-
High
-
1.0-beta
-
None
When I manually trigger a build - even if the build is a scheduled build, the 'changes' tab does not display the changelists that went into that build.
The perforce directory did have the latest code changes - so a sync was definitely performed.
We really would like to see what changes go into each and every build, even if it is manually triggered.
- duplicates
-
BAM-1096 Change the way bamboo detects changes in perforce
-
- Closed
-
[BAM-750] Perforce changes are not displayed when a manual build is executed
Workflow | Original: Bamboo Workflow 2016 v1 - Restricted [ 1440716 ] | New: JAC Bug Workflow v3 [ 3382210 ] |
Status | Original: Resolved [ 5 ] | New: Closed [ 6 ] |
Workflow | Original: Bamboo Workflow 2016 v1 [ 1415704 ] | New: Bamboo Workflow 2016 v1 - Restricted [ 1440716 ] |
Workflow | Original: Bamboo Workflow 2014 v2 [ 618688 ] | New: Bamboo Workflow 2016 v1 [ 1415704 ] |
Workflow | Original: Bamboo Workflow 2014 [ 604845 ] | New: Bamboo Workflow 2014 v2 [ 618688 ] |
Workflow | Original: Bamboo Workflow 2010 [ 202782 ] | New: Bamboo Workflow 2014 [ 604845 ] |
Workflow | Original: reviewflow [ 165281 ] | New: Bamboo Workflow 2010 [ 202782 ] |
Workflow | Original: jira [ 75685 ] | New: reviewflow [ 165281 ] |
Resolution | New: Fixed [ 1 ] | |
Status | Original: Reopened [ 4 ] | New: Resolved [ 5 ] |
Internal Work Bucket | New: Confirmed | |
Work Type | Original: [Repository Connections, Investigation required] | New: [Investigation required, Repository Connections] |