Which repository, branch, commit triggered the Bamboo Spec to run

XMLWordPrintable

    • 1

      Problem Definition

      Basically our concept is to have "Staging" Projects for Plans before merging them to master which would be considered "Production".

      Suggested Solution

      Have an Event that was triggered and that rest api could look at after the fact.

      Why this is important

      We need input information on the trigger that started Bamboo Spec. We need to be able to tie a particular run of Bamboo Spec to either a repo and a commit or to the linked repo in Bamboo.

            Assignee:
            Unassigned
            Reporter:
            Ricardo
            Votes:
            1 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: