Description
As described in https://support.atlassian.com/browse/BSP-5713.
If there's a Triggered Build Strategy configured for a Plan then at the end of build a change detection is triggered. In case a build has commited something to repository then another build is triggered which is not in sync with configured build strategy.
Attachments
Issue Links
- is superseded by
-
BAM-8122 Option to set an ignore pattern by repository comment/author
- Closed