Issue Links are lost after a subtask is moved to a new parent

XMLWordPrintable

    • 3.05

      Links are lost after a subtask is moved.

      I have subtask A that is linked to task B. If I moved the subtask A to task C, the link between A and B is lost.

              Assignee:
              Chris Mountford
              Reporter:
              Dylan Etkin [Atlassian]
              Votes:
              0 Vote for this issue
              Watchers:
              0 Start watching this issue

                Created:
                Updated:
                Resolved: